Skip to content

To ensure the Exam Committee continues to reflect the diversity of the licensee candidate population, volunteer applicants representing these jurisdictions are preferred for terms that begin October 1, 2026.

checkmark-burnt

Inventory, Analysis, and Project Management

3 open seats

Content areas
  • Project Management
  • Inventory and Data Collection
  • Stakeholder Engagement Process
  • Physical Analysis
  • Contextual Analysis
Representation most needed
  • Alberta
  • Arkansas
  • British Columbia
  • Florida
  • Manitoba
  • North Dakota
  • Ontario
  • South Dakota
  • Utah
  • Virginia
  • Washington

Planning and Design

2 open seats

Content areas
  • Stewardship and Design Principles
  • Master Planning
  • Schematic Design
  • Design Development
Representation most needed
  • Alberta
  • British Columbia
  • California
  • Connecticut
  • Louisiana
  • Manitoba
  • Maryland
  • Ontario
  • Oregon
  • Virginia
  • Washington
Checkmark-Light orange

Construction Documentation and Administration

2 open seats

Content areas
  • Construction Plans and Details
  • Construction Specifications and Bidding
  • Construction Administration
Representation most needed
  • Alberta
  • British Columbia
  • California
  • Georgia
  • Idaho
  • Kansas
  • Manitoba
  • Minnesota
  • Missouri
  • Montana
  • Nebraska
  • Nevada
  • New Mexico
  • North Dakota
  • Oregon
  • South Dakota
  • Washington
  • Wisconsin
  • Wyoming
checkmark-teal

Grading, Drainage, and Stormwater Management

1 open seat

Content areas
  • Stormwater Management
  • Grading and Earthwork
  • Drainage Systems
Representation most needed
  • Alberta
  • British Columbia
  • California
  • Idaho
  • Kansas
  • Manitoba
  • Minnesota
  • Missouri
  • Montana
  • Nebraska
  • Nevada
  • New Mexico
  • North Dakota
  • Ontario
  • Oregon
  • South Dakota
  • Washington
  • Wisconsin
  • Wyoming
Scroll To Top